Volar Avionics & Restorations
Garmin GTN navigator and audio panel installed in an aircraft panel

Regulations Explained

Pitot-Static & Transponder Certification: What the Regs Require

Under 14 CFR 91.411, the static system and altimeter must be tested within the preceding 24 calendar months for IFR flight in controlled airspace, and 14 CFR 91.413 requires the transponder tested on the same 24-month cycle.

Volar Avionics · July 18, 2026

Two checks, one clock

Pitot-static and transponder certifications are among the most common maintenance items owners ask about, partly because they run on the same 24-month cadence and are often confused with each other. They are actually two separate regulatory requirements that happen to share a schedule and frequently get done in the same visit.

What the regulations say

  • 14 CFR 91.411 covers the static pressure system, altimeter, and automatic altitude reporting equipment. For flight under IFR in controlled airspace, these must have been tested and inspected within the preceding 24 calendar months.
  • 14 CFR 91.413 covers the transponder. Each transponder must have been tested and inspected within the preceding 24 calendar months.

Because both are on a two-year cycle, many owners simply bundle them into a single pitot-static and transponder certification appointment.

Why it matters

These checks aren't busywork. Your altimeter and altitude reporting are what keep you correctly separated from other traffic in the IFR system, and a healthy transponder is what lets ATC and nearby aircraft see you. A slow leak in the static system or a drifting altimeter is exactly the kind of thing these tests are designed to catch before it becomes a problem.

When are you due?

The 24 months are counted in calendar months, so a check completed in June is good through the end of June two years later. If you've recently had avionics work that touched the static system or transponder, that's a natural time to re-verify.

Not sure when you're due, or need it done? Request a quote and we'll get your aircraft on the schedule and back in the air legal for IFR.

Frequently asked questions

How often is a pitot-static check required?+

Under 14 CFR 91.411, the static system and altimeter must be tested and inspected within the preceding 24 calendar months for flight under IFR in controlled airspace. It's a two-year cycle.

What about the transponder?+

14 CFR 91.413 requires the transponder to be tested and inspected within the preceding 24 calendar months. It's a separate requirement from the pitot-static check, though the two are often done together.

Do I need these if I only fly VFR?+

The 91.411 static and altimeter test is tied to IFR flight in controlled airspace, but 91.413 transponder testing applies whenever a transponder is required or used. If you have a transponder, plan on the 24-month check.

Ready to talk about your aircraft?

Tell us what you fly and what you have in mind — we'll put together a plan and a quote.

Request a Quote