Two checks, one clock
Pitot-static and transponder certifications are among the most common maintenance items owners ask about, partly because they run on the same 24-month cadence and are often confused with each other. They are actually two separate regulatory requirements that happen to share a schedule and frequently get done in the same visit.
What the regulations say
- 14 CFR 91.411 covers the static pressure system, altimeter, and automatic altitude reporting equipment. For flight under IFR in controlled airspace, these must have been tested and inspected within the preceding 24 calendar months.
- 14 CFR 91.413 covers the transponder. Each transponder must have been tested and inspected within the preceding 24 calendar months.
Because both are on a two-year cycle, many owners simply bundle them into a single pitot-static and transponder certification appointment.
Why it matters
These checks aren't busywork. Your altimeter and altitude reporting are what keep you correctly separated from other traffic in the IFR system, and a healthy transponder is what lets ATC and nearby aircraft see you. A slow leak in the static system or a drifting altimeter is exactly the kind of thing these tests are designed to catch before it becomes a problem.
When are you due?
The 24 months are counted in calendar months, so a check completed in June is good through the end of June two years later. If you've recently had avionics work that touched the static system or transponder, that's a natural time to re-verify.
Not sure when you're due, or need it done? Request a quote and we'll get your aircraft on the schedule and back in the air legal for IFR.

